Shift planning

1) Goals and framework

Shift planning ensures continuous platform readiness for incidents and traffic peaks without command burnout. Objectives:
  • guarantee coverage of SLO-critical processes (deposits, rates/settle, conclusions, KYC/AML);
  • Reduce MTTA/MTTR at any time of the day
  • comply with labour laws and internal policies (weekends/breaks/nights).

2) Roles and support levels

L1 (NOC/Operations): primary triage, running runbook, escalation.
L2 (Domain On-Call): Payments, Games/Core, Data/Infra - deep diagnostics and fixes.
L3 (SRE/Platform/Dev): configuration changes, patches, emergency releases.
IC/CL (Incident Commander/Comms Lead): Manages incident and communications.
Duty Manager (by shift): confirms staffing, risks, freeze-windows.

3) Shift and rotation models

3. 1 24 × 7 coverage

8 × 3 (three eight-hour): Day (08: 00-16: 00), Swing (16: 00-00: 00), Night (00: 00-08: 00). Easy to manage, requires more employees.
12 × 2 (two twelve-hour): Day (08: 00-20: 00), Night (20: 00-08: 00). Fewer handovers, higher risk of fatigue - use with restrictions.
Follow-the-sun: EU → AMER → APAC, minimal night; requires a distributed command.

3. 2 Rotation templates (example)

Panama/Pitman (2-2, 3-2, 2-3): alternating 12-hour with long weekends (requires strict fatigue control).
4-on/4-off (12h): 4 days for 12 hours, 4 days off; suitable for L1 with good automation.
5 × 8 (classic): for L2/L3 + on-call nights/weekends.

3. 3 On-call duty

Primary/Secondary: Each domain has a primary and secondary on-call.
Shadow-on-call: Training new engineers under Primary's wing.

4) Calculation of state and shrinkage (shrinkage)

4. 1 Basic FTE formula

Required FTEs for the role:

FTE = (coverage hours per week/productive FTE hours per week) × (1 + shrinkage)

Where shrinkage includes vacation/sick leave/training/1: 1/retro/admin time (usually 20-35%).

Example (L1 24 × 7, 8 hours):
  • 168 hours coverage/35 productive hours/week ≈ 4. 8
  • With shrinkage 30% → 4. 8 × 1. 3 ≈ 6. 2 FTE (round to 7 for stability).

4. 2 Peak plan

Add peak factor for events (top matches, tournaments): + 10-25% FTE in calendar windows. Use historical alert/traffic plots.

5) SLO coverage and risk windows

Build a matrix of critical hours (local prime time GEO/payment methods).
Set the minimum composition per slot (for example, Night: L1 × 2, L2-Payments × 1 on-call, L2-Games × 1 on-call, IC by rotation).
For releases/migrations, assign a release guard (option L2/SRE) for the period and + 60 minutes of post-monitoring.

6) Handovers (shift transfer)

Structure 10-15 minutes:

1. SLO/alert and open incident status.

2. Planned work in the window + risks.

3. Blockers/waits (PSP/KYC providers, regulation).

4. Agreed comm plans (status page, partners).

5. Check shift composition and on-call contacts.

The handover checklist must be in the wiki/bot; protocol - in var-room or replaceable channel.

7) Calendar and replacements

Planning horizon: 8-12 weeks; replacement - no later than 2 weeks (except for force majeure).
Freeze periods: major events/holidays - vacation ban for key roles (compensated later).
Buddy-rule: replacement only by an engineer of the same domain/qualification or with additional shadow.

8) Platform integrations

Alerting: routing by active shift and domains (P1→pager+var room).
Incident bot: teams '/rota ', '/whoisoncall', auto-mentions IC/CL.
Releases: CAB synchronized with shift schedule; off-coverage releases - prohibited.
Status page: CL from active shift confirmed in bot.

9) Team sustainability and health

Labor standards: night/weekend - surcharges and time off; maximum night in a row (for example, ≤3).
Breaks: every 2-3 hours a short break; at 12h - mandatory two long.

Fatigue-watch: limit of hours/week, the rule "no more than N P1 per shift per one."

Psychological support: debrief after heavy P1, comp-time.

10) Multi-region and follow-the-sun

Divide brands/tenants by region (EU/LATAM/APAC) with local L1 and domain L2.
Regional ICs escalate to a global IC in cross-regional incidents.
Daily cross-region handover (15 min) with transfer of risks and works.

11) Politicians and RACI

Policy "Shift & On-Call": Who steps in, how and when; replacements; tardiness; reserve.
SoD/accesses: IC/CL/financial transactions - separate roles; JIT boosts via bot only.
RACI: each shift has IC (A), Duty Manager (A/R), L1/L2 (R), Compliance/Sec (C), management (I).

12) Tools and data

Single calendar (with attributes: domain, region, contact, reserve).
Shift load dashboards: alerts/hour, incidents/type, releases/windows.
Justice Reports (fair-share): Night/weekend coverage by people.
Integration with HR/PTO so that shrinkage is counted automatically.

13) Quality Metrics (KPI/KRI)

Coverage Rate:% hours with full cast.
MTTA/MTTR by slot: day/evening/night.
Handover Defects: number of missing checklist items.
Pager Fatigue: alert/person/week; night calls (target - ↓).
Replacement SLA:% of closed shifts by replacement ≤ 48 hours before the start.
Training Coverage: share of shifts with shadow slot for new operators.
Fair-Share Index: Evenness of nights/days off by employee.

14) Implementation Roadmap (4-8 weeks)

Ned. 1-2: collect the history of alerts/peaks, determine SLO-critical windows; choose a model (8 × 3 or follow-the-sun), calculate FTE and shrinkage.
Ned. 3-4: publish Policy "Shift & On-Call," enable handover-checklist, run general calendar and bot commands '/whoisoncall ', '/handover'.
Ned. 5-6: debug escalations and replacements, add fair-share reports, synchronize CAB/releases with shifts, enter freeze windows.
Ned. 7-8: retro in terms of burnout and quality of handovers, correction of the composition of night ones, launch of a shadow program and IC/CL certification.

15) Patterns and artifacts

Shift Rota (example for EU, Kyiv time):
SlotTimeL1L2-Payments (on-call)L2-Games (on-call)ICCL
Day08:00–16:00211by rotationby rotation
Swing16:00–00:00211by rotationby rotation
Night00:00–08:00211by rotationby rotation

Handover Checklist (10 points): SLO, incidents, works, risks, releases, providers, accesses, status pages, open tickets, staffing.
Replacement SOP: how to issue a replacement, admission criteria, reserve contact.
Freeze Calendar: events/holidays and bans on RTO/releases.

16) Antipatterns

One on-call for all without domain separation.
12-hour nights in a row without restrictions and breaks.
Releases in hours without IC/CL/CL availability.
Handover "on spoken word," without checklist and notes.
Ignore shrinkage → a chronic under-set.
Zero shadow program → fragility and SPOF in humans.

Total

Shift planning is an engineering task: calculation of FTE and shrinkage, honest rotation and health protection, strict handovers and integration with alerting/ChatOps/CAB. This framework provides predictable 24 × 7 SLO coverage, fast incident responses, and business resilience without team burnout.

Contact

Get in Touch

Reach out with any questions or support needs.We are always ready to help!

Start Integration

Email is required. Telegram or WhatsApp — optional.

Your Name optional
Email optional
Subject optional
Message optional
Telegram optional
@
If you include Telegram — we will reply there as well, in addition to Email.
WhatsApp optional
Format: +country code and number (e.g., +380XXXXXXXXX).

By clicking this button, you agree to data processing.